Thursday, 21 June 2012
Sunday, 10 June 2012
Installing the proper rail bracket
After talking with my neighbour Paul and re-reading the fitting instructions, I realised that the bracket are screwed to the vertical rafters of the roof - not the horizontal battens. So I replaced my weak bracket with a study one.
You have to angle grind the tile to fit flush on top of the bracket.
You have to angle grind the tile to fit flush on top of the bracket.
Saturday, 19 May 2012
Monday, 14 May 2012
Tuesday, 17 April 2012
Tuesday, 6 March 2012
Wednesday, 29 February 2012
ESB free export meter and additional tariff grid-tied scheme expired.
This scheme had the following features:
1) Get your system spec approved by ESB
2) Get your inverter connect by electrician and cert to ESB
3) ESB would connect a feed-in meter for free
4) ESB would buy back units at 9 cents a unit (KWh) (Expires 31st Dec 2011)
5) Additional tariff or 10 cents for first 3000 units each year. This payment will be made to the first 4,000 micro-generators connected in the 3 years from February 2009 and will be paid over a 5 year period.(Expires 29th Feb 2012)
This scheme had the following features:
1) Get your system spec approved by ESB
2) Get your inverter connect by electrician and cert to ESB
3) ESB would connect a feed-in meter for free
4) ESB would buy back units at 9 cents a unit (KWh) (Expires 31st Dec 2011)
5) Additional tariff or 10 cents for first 3000 units each year. This payment will be made to the first 4,000 micro-generators connected in the 3 years from February 2009 and will be paid over a 5 year period.(Expires 29th Feb 2012)